News

Maintenance Stop High Flux Reactor Petten
Posted: July 9, 2009

The annual summer stop of the High Flux Reactor in Petten, during which regular preventative maintenance, testing and inspection is performed; is planned for the period 18 July to 18 August 2009 inclusive. As in 2006, 2007 and 2008, an inspection of the cooling water pipework will be part of the programme. The inspection concentrates upon the analysis of 4 locations in the pipework where localized deformations are known and where a small bubble stream was observed in 2008.

Back

Join us as a member

Filled out our membership form and join CARS Membership today for more radiopharmaceutical and scientific knowledge.